Ghar Tak Pakki Gali Naliyaan

Ghar Tak Pakki Gali Naliyaan

Inorder to strengthen the rural infrastructure, Nishchay "Ghar Tak Pakki Gali Naliyan" was inaugrated on 28th of October, 2016. After implementation of the Pradhanmantri Gram Sadak Yojana, left out habitations having no link, shall be linked with pucca road, pucca drainage and by-lanes will be provided in all villages and towns under this scheme. Three schemes have been launched to achieve this goal :-

1. Gramin Tola Sampark Nishchay Yojana.

2. Mukhyamantri Gramin Gali Nali Puccikaran Nishchay Yojana.

3. Mukhyamantri Shahri Nali Gali Puccikaran Nishchay Yojana

 

Gramin Tola Sampark Nishchay Yojana

  • “Gramin Tola Sampark Nishchay Yojana” was launched on 28th October, 2016.
  • All weather single connectivity to the habitations of 250 or more population in 11 district and habitations of 500 or more population in all districts is being provided under Pradhan Mantri Gram Sadak Yojana, while Mukhyamantri Gram Sampark Yojana covers all the habitations of more than 250 but less than 500 population in all the districts.
  • Eligible habitations and tola have been left uncovered in large numbers in both kinds of networks mentioned above. Most of these tolas / habitations belongs to the economically and socially backward classes, schedule castes and scheduled tribes.
  • The state government has decided to identify all such uncovered and unconnected tola / habitations  on the basis of satellite imaging and prepare a supplementary state core network  after their physical survey/ verification. On the basis of this core network all weather road connectivity will be provided to habitations with 100 or more population.
  • Under this scheme, 13786 (population more than 100) unconnected habitations have been identified. Out of which 4643 habitations with population 100 to 249 will be provided connectivity within three years, under Gramin Tola Sampark Nishchay Yojana. Rest 9143 unconnected habitations will be provided connectivity under Mukhyamantri Gram Sampark Yojana (MMGSY) within five years.
  •  Under  Gramin Tola Sampark Nishchay Yojana, 1751 habitations will be provided connectivity by constructing 1500 km road during the financial year 2018-2019.